{"id":15962,"date":"2026-02-20T09:52:27","date_gmt":"2026-02-20T09:52:27","guid":{"rendered":"https:\/\/www.langir.com\/?p=15962"},"modified":"2026-02-28T17:26:00","modified_gmt":"2026-02-28T17:26:00","slug":"wire-2-pole-dc-circuit-breaker","status":"publish","type":"news","link":"https:\/\/www.langir.com\/pl\/news\/wire-2-pole-dc-circuit-breaker\/","title":{"rendered":"Jak pod\u0142\u0105czy\u0107 2-biegunowy wy\u0142\u0105cznik pr\u0105du sta\u0142ego: Krok po kroku dla bezpiecznej i niezawodnej instalacji"},"content":{"rendered":"<div class=\"wpb-content-wrapper\"><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n\t<div class=\"wpb_text_column wpb_content_element\" >\n\t\t<div class=\"wpb_wrapper\">\n\t\t\t<p>&nbsp;<\/p>\n<p><!-- \/wp:post-content --><\/p>\n<p><!-- wp:paragraph -->Installing a 2\u2011pole DC circuit breaker is a basic but essential task for anyone working with DC systems, especially in solar and industrial settings. This guide walks you through the wiring process clearly and safely. A <a href=\"https:\/\/www.langir.com\/dc-circuit-breaker\/\">2\u2011pole DC circuit breaker<\/a> protects circuits from overloads and shorts, so correct installation is vital to keep systems reliable. Many mistakes happen during wiring \u2014 this article explains what a 2\u2011pole breaker does, shows step\u2011by\u2011step wiring, flags common errors, and outlines where these breakers are used.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p><!-- wp:paragraph -->A basic grasp of circuit behavior and common fault types makes it easier to see why proper breaker wiring matters.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:quote --><\/p>\n<blockquote class=\"wp-block-quote\">\n<p><strong>Electrical Faults and Circuit Reliability<\/strong><\/p>\n<p>Electricity powers daily life, but it must be controlled to be safe. Every electrical design is a circuit, and predictable math governs how that circuit behaves. Kirchhoff\u2019s laws require that voltages and currents around a closed loop balance; if they don\u2019t, something is wrong. Ohm\u2019s law links current, voltage and impedance (resistance, inductance and capacitance). Deviations\u2014unexpected current rises or voltage drops\u2014signal a fault that protection devices must address.<\/p>\n<p>Circuit Breaker Testing and Calibration by Simulating Common Faults and Checking Reliability, 2025<\/p>\n<\/blockquote>\n<p><!-- \/wp:quote --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>What Is a 2\u2011Pole DC Circuit Breaker and Why Proper Wiring Matters?<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->A 2\u2011pole DC circuit breaker is a protective device that simultaneously interrupts both DC conductors\u2014typically the positive and negative\u2014so the circuit is fully isolated. That dual\u2011pole isolation is critical in systems where safety and continuity matter, such as solar PV arrays and industrial control panels. Correct wiring prevents short circuits, reduces fire risk, and helps the breaker operate as designed.<\/p>\n<p><a href=\"https:\/\/www.langir.com\/dc-circuit-breaker\/\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-16035\" src=\"https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/What-Is-a-2\u2011Pole-DC-Circuit-Breaker-and-Why-Proper-Wiring-Matters.jpg\" alt=\"What Is a 2\u2011Pole DC Circuit Breaker and Why Proper Wiring Matters\" width=\"979\" height=\"335\" srcset=\"https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/What-Is-a-2\u2011Pole-DC-Circuit-Breaker-and-Why-Proper-Wiring-Matters.jpg 979w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/What-Is-a-2\u2011Pole-DC-Circuit-Breaker-and-Why-Proper-Wiring-Matters-300x103.jpg 300w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/What-Is-a-2\u2011Pole-DC-Circuit-Breaker-and-Why-Proper-Wiring-Matters-768x263.jpg 768w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/What-Is-a-2\u2011Pole-DC-Circuit-Breaker-and-Why-Proper-Wiring-Matters-18x6.jpg 18w\" sizes=\"(max-width: 979px) 100vw, 979px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><a class=\"pum-trigger\" href=\"http:\/#popmake-11886\"><u>Get a quote for custom DC circuit breakers from Langir<\/u><\/a><\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>What Defines a 2\u2011Pole DC Circuit Breaker?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Key traits include the rated DC voltage and current the breaker can handle, and its interrupting (breaking) capacity. These breakers commonly cover ranges from 12V up to 1000V DC, serving small battery systems up to large photovoltaic and industrial installations. Choose a breaker whose voltage, current and breaking capacity match your system\u2019s potential fault conditions.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Why Correct Wiring Improves Safety and Arc Suppression<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Wiring a 2\u2011pole breaker correctly ensures both conductors open together, which reduces the chance of sustained arcing and protects downstream equipment. Proper installation\u2014following manufacturer instructions and safety standards\u2014reduces wear on contacts and lowers fire and equipment\u2011failure risk. Incorrect wiring can defeat arc suppression measures and cause serious damage.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>How Do You Wire a 2\u2011Pole DC Circuit Breaker Correctly?<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Wiring a 2\u2011pole DC breaker safely requires attention to detail and basic electrical practice. Follow the steps below and always consult local codes and the breaker\u2019s datasheet.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Essential Safety Precautions Before Wiring<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:list {\"ordered\":true} --><\/p>\n<ol>\n<li><strong>De\u2011energize the system<\/strong>: Turn off the power and isolate energy sources before you begin.<\/li>\n<li><strong>Use insulated tools<\/strong>: Work with tools rated for electrical use to reduce shock and short risks.<\/li>\n<li><strong>Confirm zero volts<\/strong>: Verify absence of voltage with a reliable meter before touching conductors.<\/li>\n<\/ol>\n<p><!-- \/wp:list --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Step\u2011by\u2011Step Wiring Procedure for 2\u2011Pole DC Breakers<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:list {\"ordered\":true} --><\/p>\n<ol>\n<li><strong>Identify terminals<\/strong>: Note input (source) and output (load) terminals\u2014terminals are usually labeled.<\/li>\n<li><strong>Connect source conductors<\/strong>: Attach the positive and negative (or +\/\u2013) source wires to the input terminals. Ensure correct polarity and secure terminations.<\/li>\n<li><strong>Connect load conductors<\/strong>: Connect the corresponding output wires to the load terminals, keeping polarity consistent.<\/li>\n<li><strong>Inspect and test<\/strong>: Double\u2011check torque on terminals, confirm insulation and clearances, then restore power and verify normal operation. Watch for heat, unusual noise, or other signs of trouble.<\/li>\n<\/ol>\n<p><!-- \/wp:list --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>Polarized vs. Non\u2011Polarized DC Circuit Breakers \u2014 What\u2019s the Difference?<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Polarized breakers require specific polarity on their terminals to function as intended. Non\u2011polarized breakers can be installed in either orientation. Choose polarized units where manufacturer guidance or system design depends on a defined conductor assignment; use non\u2011polarized breakers when orientation flexibility is needed.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>How Polarity Affects Breaker Performance<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Polarity matters because some internal mechanisms and test circuits assume a particular conductor order. Reversing polarity on a polarized breaker can prevent proper tripping or impair arc control. Non\u2011polarized breakers avoid that constraint but verify suitability for the application and voltage level before selecting one.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Identifying and Wiring Polarized vs. Non\u2011Polarized Breakers<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Check terminal markings and the datasheet. For polarized breakers, connect positive and negative exactly as labeled. For non\u2011polarized units, either conductor can be connected to either pole\u2014but still follow the manufacturer\u2019s wiring and torque specifications.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>Common Wiring Mistakes to Avoid When Installing 2\u2011Pole DC Breakers<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Avoiding simple errors keeps systems safe and reliable. Take your time during installation and verification.<\/p>\n<p><a href=\"https:\/\/www.langir.com\/dc-circuit-breaker\/\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-16036\" src=\"https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/Common-Wiring-Mistakes-to-Avoid-When-Installing-2\u2011Pole-DC-Breakers.jpg\" alt=\"Common Wiring Mistakes to Avoid When Installing 2\u2011Pole DC Breakers\" width=\"510\" height=\"340\" srcset=\"https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/Common-Wiring-Mistakes-to-Avoid-When-Installing-2\u2011Pole-DC-Breakers.jpg 510w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/Common-Wiring-Mistakes-to-Avoid-When-Installing-2\u2011Pole-DC-Breakers-300x200.jpg 300w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/Common-Wiring-Mistakes-to-Avoid-When-Installing-2\u2011Pole-DC-Breakers-18x12.jpg 18w\" sizes=\"(max-width: 510px) 100vw, 510px\" \/><\/a><\/p>\n<p><a class=\"pum-trigger\" href=\"http:\/#popmake-11886\"><u>Get a quote for custom DC circuit breakers from Langir<\/u><\/a><\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>How Reversed Polarity Impacts Breaker Function<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->If polarity is reversed on a polarized breaker, it may fail to trip under fault conditions or experience accelerated wear. That can allow damaging currents to persist, risking equipment and safety.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Other Frequent Installation Errors and How to Fix Them<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:list {\"ordered\":true} --><\/p>\n<ol>\n<li><strong>Loose connections<\/strong>: Always torque terminals to the manufacturer\u2019s specification to prevent arcing and overheating.<\/li>\n<li><strong>Incorrect sizing<\/strong>: Match the breaker\u2019s voltage, continuous current rating and breaking capacity to your system\u2014undersized breakers will fail to protect equipment.<\/li>\n<li><strong>Ignoring codes<\/strong>: Follow local electrical codes and industry best practices; consult a licensed electrician when in doubt.<\/li>\n<\/ol>\n<p><!-- \/wp:list --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>Where 2\u2011Pole DC Circuit Breakers Are Used: Solar and Industrial Systems<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->2\u2011pole DC breakers are common in solar PV arrays, battery systems and industrial DC control panels. Their ability to interrupt both conductors fast makes them well suited to environments where safety and uptime are priorities.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p><!-- wp:paragraph -->From large industrial installs to smaller residential systems, 2\u2011pole DC breakers provide a consistent layer of protection across many DC applications.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:quote --><\/p>\n<blockquote class=\"wp-block-quote\">\n<p><strong>DC Circuit Breaker Applications in Industrial &amp; Domestic Systems<\/strong><\/p>\n<p>DC circuit breakers\u2014mechanical, solid\u2011state and hybrid types\u2014are used across domestic and industrial systems that rely on direct current. They are particularly important in HVDC and other high\u2011voltage DC networks where protecting equipment from faults is critical.<\/p>\n<p>&nbsp;<\/p>\n<p><span class=\"cite-source\">Applications of various types of circuit breakers in electrical power systems: a review, PI Obi, 2021<\/span><\/p>\n<\/blockquote>\n<p><!-- \/wp:quote --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Wiring 2\u2011Pole DC Breakers in Solar Photovoltaic Systems<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->In PV systems, breakers are typically placed between the panel\/string output and the inverter or battery input. Proper placement and wiring let the breaker isolate the array during faults or maintenance, protecting both the panels and downstream electronics.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Industrial Applications and Wiring Considerations<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->In industrial settings, 2\u2011pole DC breakers protect control panels, motor drives and battery banks. Consider system voltage, expected fault current, conductor sizes, and ambient conditions when specifying and wiring breakers to ensure safe, reliable performance.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>Choosing the Right 2\u2011Pole DC Circuit Breaker and Customizing It<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Selecting the correct breaker means checking a few key specs and planning for real\u2011world fault conditions. Proper selection reduces downtime and extends equipment life.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Technical Specifications to Consider<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:list {\"ordered\":true} --><\/p>\n<ol>\n<li><strong>Voltage rating<\/strong>: Verify the breaker\u2019s maximum DC voltage matches your system.<\/li>\n<li><strong>Current rating<\/strong>: Choose a breaker that can handle the system\u2019s continuous current and occasional surges.<\/li>\n<li><strong>Breaking capacity<\/strong>: Ensure the breaker\u2019s interrupting rating exceeds the maximum possible fault current.<\/li>\n<\/ol>\n<p><!-- \/wp:list --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>How Langir\u2019s JB Series Supports Customization and Bulk Ordering<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Langir Electric\u2019s JB Series offers customizable 2\u2011pole DC breakers and scalable production for industrial customers. With in\u2011house tooling and technical support, Langir can tailor specifications and handle volume orders to meet manufacturers\u2019 needs. For project inquiries, see <a href=\"https:\/\/www.langir.com\/contact\/\">Contact Langir Electric<\/a>.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>How to Wire a 2\u2011Pole DC Circuit Breaker | FAQs<\/h2>\n<p><a href=\"https:\/\/www.langir.com\/dc-circuit-breaker\/\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-16037\" src=\"https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/How-to-Wire-a-2\u2011Pole-DC-Circuit-Breaker-FAQs.jpg\" alt=\"How to Wire a 2\u2011Pole DC Circuit Breaker FAQs\" width=\"733\" height=\"489\" srcset=\"https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/How-to-Wire-a-2\u2011Pole-DC-Circuit-Breaker-FAQs.jpg 733w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/How-to-Wire-a-2\u2011Pole-DC-Circuit-Breaker-FAQs-300x200.jpg 300w, https:\/\/www.langir.com\/wp-content\/uploads\/2026\/02\/How-to-Wire-a-2\u2011Pole-DC-Circuit-Breaker-FAQs-18x12.jpg 18w\" sizes=\"(max-width: 733px) 100vw, 733px\" \/><\/a><\/p>\n<p style=\"text-align: center;\"><a class=\"pum-trigger\" href=\"http:\/#popmake-11886\"><u>Get a quote for custom DC circuit breakers from Langir<\/u><\/a><\/p>\n<p><!-- \/wp:heading --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>What are the signs that a 2\u2011pole DC circuit breaker needs to be replaced?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Replace a breaker if it trips repeatedly without an obvious cause, shows visible damage (cracks, burn marks), won\u2019t reset after tripping, or runs unusually hot or noisy. Failure to trip under test conditions also indicates internal fault and warrants replacement.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Can I install a 2\u2011pole DC circuit breaker myself, or should I hire a professional?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->If you have electrical training and understand local codes, you can install a breaker following the manufacturer\u2019s instructions. Otherwise, hire a qualified electrician. Professional installation reduces code violations and safety risks.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>What maintenance is required for 2\u2011pole DC circuit breakers?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Maintain breakers with periodic inspections: check for corrosion, tight connections, clean contacts and proper ventilation. Test operation per the manufacturer\u2019s guidance and replace components that show wear.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>How do environmental factors affect the performance of 2\u2011pole DC circuit breakers?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Temperature, humidity, dust and corrosive atmospheres affect breaker life and performance. High heat increases contact wear; humidity and corrosives can corrode terminals. Use appropriate enclosures and environmental ratings to protect breakers.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>What is the difference between a 2\u2011pole DC circuit breaker and a fuse?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Both protect circuits, but a breaker can reset after tripping while a fuse must be replaced once it blows. Breakers are more convenient for repeated events and testing; fuses are simple and sometimes more cost\u2011effective for one\u2011time protection.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":3} --><\/p>\n<h3>Are there specific brands or models of 2\u2011pole DC circuit breakers that are recommended?<\/h3>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Choose a brand and model that match your voltage, current and breaking\u2011capacity needs. Langir Electric, Schneider Electric and Eaton are well known for reliable DC protection. Always compare datasheets and certifications before selecting a product.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n<p><!-- wp:heading {\"level\":2} --><\/p>\n<h2>Conclusion<\/h2>\n<p><!-- \/wp:heading --><\/p>\n<p><!-- wp:paragraph -->Correctly wiring a 2\u2011pole DC circuit breaker keeps systems safe and dependable, whether in solar arrays or industrial control panels. Follow the steps, apply the safety checks, and choose a breaker sized for your system. If you need tailored solutions or volume supply, explore Langir\u2019s product range and support to find the right protection for your project.<\/p>\n<p><!-- \/wp:paragraph --><\/p>\n<p>&nbsp;<\/p>\n\n\t\t<\/div>\n\t<\/div>\n<\/div><\/div><\/div><\/div><div class=\"vc_row wpb_row vc_row-fluid\"><div class=\"wpb_column vc_column_container vc_col-sm-12\"><div class=\"vc_column-inner\"><div class=\"wpb_wrapper\">\n<div class=\"vc-zigzag-wrapper vc-zigzag-align-center\"><div class=\"vc-zigzag-inner\" style=\"width: 100%;min-height: 14px;background: 0 repeat-x url(&#039;data:image\/svg+xml;utf-8,%3C%3Fxml%20version%3D%221.0%22%20encoding%3D%22utf-8%22%3F%3E%3C%21DOCTYPE%20svg%20PUBLIC%20%22-%2F%2FW3C%2F%2FDTD%20SVG%201.1%2F%2FEN%22%20%22http%3A%2F%2Fwww.w3.org%2FGraphics%2FSVG%2F1.1%2FDTD%2Fsvg11.dtd%22%3E%3Csvg%20width%3D%2214px%22%20height%3D%2212px%22%20viewBox%3D%220%200%2018%2015%22%20version%3D%221.1%22%20xmlns%3D%22http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%22%20xmlns%3Axlink%3D%22http%3A%2F%2Fwww.w3.org%2F1999%2Fxlink%22%3E%3Cpolygon%20id%3D%22Combined-Shape%22%20fill%3D%22%23ebebeb%22%20points%3D%228.98762301%200%200%209.12771969%200%2014.519983%209%205.40479869%2018%2014.519983%2018%209.12771969%22%3E%3C%2Fpolygon%3E%3C%2Fsvg%3E&#039;);\"><\/div><\/div><style id=\"wpforms-css-vars-12179\">\n\t\t\t\t#wpforms-12179 {\n\t\t\t\t--wpforms-field-border-color: rgba(0, 0, 0, 0.25);\n--wpforms-field-border-color-spare: rgba(0, 0, 0, 0.25);\n--wpforms-field-text-color: rgba(0, 0, 0, 0.7);\n--wpforms-label-color: rgba(0, 0, 0, 0.85);\n--wpforms-label-sublabel-color: rgba(0, 0, 0, 0.55);\n--wpforms-button-border-radius: 45px;\n--wpforms-button-background-color: #f88404;\n--wpforms-field-size-input-height: 43px;\n--wpforms-field-size-input-spacing: 15px;\n--wpforms-field-size-font-size: 16px;\n--wpforms-field-size-line-height: 19px;\n--wpforms-field-size-padding-h: 14px;\n--wpforms-field-size-checkbox-size: 16px;\n--wpforms-field-size-sublabel-spacing: 5px;\n--wpforms-field-size-icon-size: 1;\n--wpforms-label-size-font-size: 16px;\n--wpforms-label-size-line-height: 19px;\n--wpforms-label-size-sublabel-font-size: 14px;\n--wpforms-label-size-sublabel-line-height: 17px;\n--wpforms-button-size-font-size: 17px;\n--wpforms-button-size-height: 41px;\n--wpforms-button-size-padding-h: 15px;\n--wpforms-button-size-margin-top: 10px;\n--wpforms-container-shadow-size-box-shadow: none;\n\t\t\t}\n\t\t\t<\/style><div class=\"wpforms-container wpforms-container-full wpforms-render-modern\" id=\"wpforms-12179\"><form id=\"wpforms-form-12179\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"12179\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/pl\/wp-json\/wp\/v2\/news\/15962?wpforms_form_id=12179\" data-token=\"383b766d11677679b463097300c7c33a\" data-token-time=\"1776227440\"><div class=\"wpforms-head-container\"><div class=\"wpforms-title\">Get Custom Quote<\/div><div class=\"wpforms-description\">We'll get back to you within 12 hours.<\/div><\/div><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div id=\"wpforms-error-noscript\" style=\"display: none;\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-12179-field_3-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"3\"><label class=\"wpforms-field-label\" for=\"wpforms-12179-field_3\">Your Name <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-12179-field_3\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][3]\" placeholder=\"Name\" aria-errormessage=\"wpforms-12179-field_3-error\" required><\/div><div id=\"wpforms-12179-field_1-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"1\"><label class=\"wpforms-field-label\" for=\"wpforms-12179-field_1\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-12179-field_1\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][1]\" placeholder=\"Email\" spellcheck=\"false\" aria-errormessage=\"wpforms-12179-field_1-error\" required><\/div>\t\t<div id=\"wpforms-12179-field_2-container\"\n\t\t\tclass=\"wpforms-field wpforms-field-text\"\n\t\t\tdata-field-type=\"text\"\n\t\t\tdata-field-id=\"2\"\n\t\t\t>\n\t\t\t<label class=\"wpforms-field-label\" for=\"wpforms-12179-field_2\" >Company Email File<\/label>\n\t\t\t<input type=\"text\" id=\"wpforms-12179-field_2\" class=\"wpforms-field-medium\" name=\"wpforms[fields][2]\" >\n\t\t<\/div>\n\t\t<div id=\"wpforms-12179-field_6-container\" class=\"wpforms-field wpforms-field-text\" data-field-id=\"6\"><label class=\"wpforms-field-label\" for=\"wpforms-12179-field_6\">Country <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-12179-field_6\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][6]\" placeholder=\"Country\" aria-errormessage=\"wpforms-12179-field_6-error\" required><\/div><div id=\"wpforms-12179-field_4-container\" class=\"wpforms-field wpforms-field-text\" data-field-id=\"4\"><label class=\"wpforms-field-label\" for=\"wpforms-12179-field_4\">Company <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"text\" id=\"wpforms-12179-field_4\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][4]\" placeholder=\"Company\" aria-errormessage=\"wpforms-12179-field_4-error\" required><\/div><div id=\"wpforms-12179-field_7-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"7\"><label class=\"wpforms-field-label\" for=\"wpforms-12179-field_7\">Message <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><textarea id=\"wpforms-12179-field_7\" class=\"wpforms-field-medium wpforms-field-required\" name=\"wpforms[fields][7]\" placeholder=\"Message\" aria-errormessage=\"wpforms-12179-field_7-error\" required><\/textarea><\/div><div id=\"wpforms-12179-field_8-container\" class=\"wpforms-field wpforms-field-file-upload\" data-field-id=\"8\"><label class=\"wpforms-field-label\" for=\"wpforms-12179-field_8\">File Upload (Max 3)<\/label><div\n\t\tclass=\"wpforms-uploader \"\n\t\tdata-field-id=\"8\"\n\t\tdata-form-id=\"12179\"\n\t\tdata-input-name=\"wpforms_12179_8\"\n\t\tdata-extensions=\"jpg,jpeg,jpe,gif,png,bmp,tiff,tif,webp,avif,ico,heic,heif,heics,heifs,asf,asx,wmv,wmx,wm,avi,divx,mov,qt,mpeg,mpg,mpe,mp4,m4v,ogv,webm,mkv,3gp,3gpp,3g2,3gp2,txt,asc,c,cc,h,srt,csv,tsv,ics,rtx,css,vtt,mp3,m4a,m4b,aac,ra,ram,wav,x-wav,ogg,oga,flac,mid,midi,wma,wax,mka,rtf,pdf,class,tar,zip,gz,gzip,rar,7z,psd,xcf,doc,pot,pps,ppt,wri,xla,xls,xlt,xlw,mpp,docx,docm,dotx,dotm,xlsx,xlsm,xlsb,xltx,xltm,xlam,pptx,pptm,ppsx,ppsm,potx,potm,ppam,sldx,sldm,onetoc,onetoc2,onepkg,oxps,xps,odt,odp,ods,odg,odc,odb,odf,wp,wpd,key,numbers,pages\"\n\t\tdata-max-size=\"33554432\"\n\t\tdata-max-file-number=\"3\"\n\t\tdata-post-max-size=\"33554432\"\n\t\tdata-max-parallel-uploads=\"4\"\n\t\tdata-parallel-uploads=\"true\"\n\t\tdata-file-chunk-size=\"2097152\">\n\t<div class=\"dz-message\">\n\t\t<svg  viewBox=\"0 0 640 640\" focusable=\"false\" data-icon=\"inbox\" width=\"50px\" height=\"50px\" fill=\"currentColor\" aria-hidden=\"true\">\n\t\t\t<path d=\"M352 173.3L352 384C352 401.7 337.7 416 320 416C302.3 416 288 401.7 288 384L288 173.3L246.6 214.7C234.1 227.2 213.8 227.2 201.3 214.7C188.8 202.2 188.8 181.9 201.3 169.4L297.3 73.4C309.8 60.9 330.1 60.9 342.6 73.4L438.6 169.4C451.1 181.9 451.1 202.2 438.6 214.7C426.1 227.2 405.8 227.2 393.3 214.7L352 173.3zM320 464C364.2 464 400 428.2 400 384L480 384C515.3 384 544 412.7 544 448L544 480C544 515.3 515.3 544 480 544L160 544C124.7 544 96 515.3 96 480L96 448C96 412.7 124.7 384 160 384L240 384C240 428.2 275.8 464 320 464zM464 488C477.3 488 488 477.3 488 464C488 450.7 477.3 440 464 440C450.7 440 440 450.7 440 464C440 477.3 450.7 488 464 488z\"\/>\n\t\t<\/svg>\n\n\t\t<span class=\"modern-title\">\n\t\t\t\t\t\t\tDrag &amp; Drop Files, \t\t\t\t<span>Choose Files to Upload<\/span>\n\t\t\t\t\t<\/span>\n\n\t\t\t\t\t<span class=\"modern-hint\">You can upload up to 3 files.<\/span>\n\t\t\t<\/div>\n<\/div>\n\n<input\n\t\ttype=\"text\"\n\t\tautocomplete=\"off\"\n\t\treadonly\n\t\tclass=\"dropzone-input\"\n\t\tstyle=\"position:absolute!important;clip:rect(0,0,0,0)!important;height:1px!important;width:1px!important;border:0!important;overflow:hidden!important;padding:0!important;margin:0!important;\"\n\t\tid=\"wpforms-12179-field_8\"\n\t\tname=\"wpforms_12179_8\" \t\tvalue=\"\">\n<\/div><script>\n\t\t\t\t( function() {\n\t\t\t\t\tconst style = document.createElement( 'style' );\n\t\t\t\t\tstyle.appendChild( document.createTextNode( '#wpforms-12179-field_2-container { position: absolute !important; overflow: hidden !important; display: inline !important; height: 1px !important; width: 1px !important; z-index: -1000 !important; padding: 0 !important; } #wpforms-12179-field_2-container input { visibility: hidden; } #wpforms-conversational-form-page #wpforms-12179-field_2-container label { counter-increment: none; }' ) );\n\t\t\t\t\tdocument.head.appendChild( style );\n\t\t\t\t\tdocument.currentScript?.remove();\n\t\t\t\t} )();\n\t\t\t<\/script><\/div><!-- .wpforms-field-container --><div class=\"wpforms-recaptcha-container wpforms-is-recaptcha wpforms-is-recaptcha-type-invisible\" ><div class=\"g-recaptcha\" data-sitekey=\"6Lc6I8krAAAAAGhsDV78xMe5sUE34DyWnUTROEYI\" data-size=\"invisible\"><\/div><\/div><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"12179\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/news\/15962\"><input type=\"hidden\" name=\"url_referer\" value=\"\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-12179\" class=\"wpforms-submit\" data-alt-text=\"Submitting\u2026\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.langir.com\/wp-content\/plugins\/wpforms\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container -->\n<div class=\"vc-zigzag-wrapper vc-zigzag-align-center\"><div class=\"vc-zigzag-inner\" style=\"width: 100%;min-height: 14px;background: 0 repeat-x url(&#039;data:image\/svg+xml;utf-8,%3C%3Fxml%20version%3D%221.0%22%20encoding%3D%22utf-8%22%3F%3E%3C%21DOCTYPE%20svg%20PUBLIC%20%22-%2F%2FW3C%2F%2FDTD%20SVG%201.1%2F%2FEN%22%20%22http%3A%2F%2Fwww.w3.org%2FGraphics%2FSVG%2F1.1%2FDTD%2Fsvg11.dtd%22%3E%3Csvg%20width%3D%2214px%22%20height%3D%2212px%22%20viewBox%3D%220%200%2018%2015%22%20version%3D%221.1%22%20xmlns%3D%22http%3A%2F%2Fwww.w3.org%2F2000%2Fsvg%22%20xmlns%3Axlink%3D%22http%3A%2F%2Fwww.w3.org%2F1999%2Fxlink%22%3E%3Cpolygon%20id%3D%22Combined-Shape%22%20fill%3D%22%23ebebeb%22%20points%3D%228.98762301%200%200%209.12771969%200%2014.519983%209%205.40479869%2018%2014.519983%2018%209.12771969%22%3E%3C%2Fpolygon%3E%3C%2Fsvg%3E&#039;);\"><\/div><\/div><\/div><\/div><\/div><\/div><\/div>","protected":false},"excerpt":{"rendered":"<p>Okablowanie 2-biegunowego wy\u0142\u0105cznika pr\u0105du sta\u0142ego mo\u017ce by\u0107 \u0142atwe. Zapoznaj si\u0119 z prostymi krokami i wskaz\u00f3wkami, aby unikn\u0105\u0107 b\u00f3lu g\u0142owy podczas prawid\u0142owego wykonywania tej czynno\u015bci. W\u0142\u0105cz zasilanie ju\u017c dzi\u015b!<\/p>","protected":false},"author":3,"featured_media":16034,"menu_order":10,"comment_status":"closed","ping_status":"open","template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"news_category":[6],"class_list":["post-15962","news","type-news","status-publish","format-standard","has-post-thumbnail","hentry","news_category-news","entry"],"acf":[],"post_mailing_queue_ids":[],"_links":{"self":[{"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/news\/15962","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/types\/news"}],"author":[{"embeddable":true,"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/comments?post=15962"}],"version-history":[{"count":2,"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/news\/15962\/revisions"}],"predecessor-version":[{"id":16038,"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/news\/15962\/revisions\/16038"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/media\/16034"}],"wp:attachment":[{"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/media?parent=15962"}],"wp:term":[{"taxonomy":"news_category","embeddable":true,"href":"https:\/\/www.langir.com\/pl\/wp-json\/wp\/v2\/news_category?post=15962"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}